Eliza Mackenzie – Update December 2013

The original plan, as the builders prepare for their Christmas break, was that Eliza Mackenzie Court residents would now be getting ready for their Christmas celebrations, but as so often happens in the construction industry nothing quite goes as planned.

However it is not all “doom and gloom”. Externally the building looks very modern and fresh, with all the cladding, brick slips and render in place. The gardens are also taking shape and will provide a quiet peaceful  haven  for residents to relax in and possibly enjoy the odd BBQ or two if next summer is anything like the last one.

Inside continues to be a “hive of activity” with all flats now built, and on the top floor the kitchens have been fitted and the vinyl floors laid.

It is hoped that the show flat will be ready for viewing in February and once work re-commences after the festive beak we will be writing to all those who have expressed an interest in being housed in Eliza Mackenzie Court giving them a date when they can come along to view.

Currently, the plan is that the building will be handed over to the Association in April, possibly sooner. Watch the web site for the latest news.

In the meantime:

 Have a wonderful Christmas and a prosperous New Year

xmas1

Advertisements